DISTRICT-WIDE UPDATES
EARLY VOTING: APRIL 20 - 28
ELECTION DAY: MAY 2
District-wide updates are included to replace systems and equipment that are nearing or have exceeded their expected life cycle. Over the next five years, many core systems will reach the end of their useful life. The bond includes $18 million dedicated to planned life-cycle replacements to maintain reliability, safety, and functionality across all campuses.
HVAC unit replacement
HVAC controls
Replace boilers
Carson Elementary School roof replacement
Replace campus walk-in freezer and coolers
Repaint Rann Elementary School
Replace floor finishes at Rann Elementary School
LED lights
Replace water heaters
Replace plumbing pumps
Replace plumbing fixtures
Replace theatrical equipment at Decatur High School
LIFECYCLE OF BUILDING SYSTEMS
Lifecycle is the years of use you are expected to get out of a system.
With proper maintenance the system can meet and exceed their useful life.
Some building systems have longer useful lives than others.
Below is a list of common systems in DISD facilities and their expected lifecycle:
50 YEARS
Building
Electrical Panels
Fire Sprinkler System
30 YEARS
Fire Alarm System
20 YEARS
Roof
Flooring – VCT
Foodservice Equipment
Playground Equipment
15 YEARS
Paint
Flooring – carpet
HVAC Equipment
Theatrical Equipment
Click to navigate to other projects